Guest
Athletes • Staff • Students
Space
Nutrition Space • Operation/Training Center • Strength and Conditioning Space • Team Space
Method
New Build
Florida Football built a new football operations facility in 2022 and contracted Forty Nine Degrees to help brand the entire 140,000 sq.ft. facility. The training center features a prominent entrance to capture the attention of recruits, athletes and fans. It also includes a new locker room, nutrition center, weight room, indoor practice facility, offices and meeting rooms. Branding was kept clean and modern throughout the facility. A cool feature added to the players route to their locker room was an orange and blue light-up tunnel adding a fun photo/video opt.
Services
Consulting • Design • Fabrication • Installation • Technology